Reference «Energy from Waste»
Entsorgungszentrum, Herten City, Germany

Customer:
RZR Herten II GmbH
Fuel:
SMW and industrial waste
Power:
2 x 52 Mw heat; 2 x 17 tons per hour; 10 800 KJ/kg
Grid system:
Shove grid
Commissioning year:
2008
Scope of delivery:
The General Contractor Expanding the operating facility on «Turn-key» basis for 2 SMW lines (including a furnace, a boiler, a fume scrubber, a constructive part, a turbine, an electrical part and instrumentation. Installation, commissioning)
Features:
6 lines (4 SMW lines and highly hazardous waste). SMW: 3 lines – general contract; 1 line – grate and boiler, fume scrubbing, auxiliary equipment. Highly hazardous waste: 1 line; 2 pipe furnaces, a boiler, fume scrubbing


Reference «Energy from Waste – Waste incineration»
Acerra City, Italy

Customer:
RZR Herten II GmbH
Customer:
FibeS. p. A.
Fuel:
alternative fuel
PowerМощность:
3 x 113 MW heat; 3 x 27 tons per hour; 15,070 KJ/kg
Grid system:
Shove grid (water-cooled)
Commissioning year:
2009
Scope of delivery:
Combustion system, a boiler, fume scrubbing, constructive part, turbine; installation, commissioning of a 3-line incineration plant in the framework of the General Contract
Features:
Annual capacity – 660,000 tons. Stream-optimized facility. 120 MW Turbine/generator


Reference «Energy from Waste — Waste Incineration»
Berlin Ruhleben, Germany


RZR Herten II GmbH, Berliner Stadtreinigungsbetriebe
Fuel:
SMW
Power:
90 Mw heat; 1 x 36 tons per hour; 9,000 KJ/kg
Grid system:
Shove grid
Commissioning year:
2012
Scope of delivery:
The General Contractor "Turn-key" construction of line A facility (including a furnace, a boiler, a fume scrubber, an electrical part and instrumentation, constructive part without silo)
Features:
One of the biggest grids in the world, substituting 4 old lines for one new


Reference «Energy from Waste — Waste Incineration» Klaipeda City, Lithuania

Customer:
RZR Herten II GmbH
Customer:
FortumBaltic Investment
Fuel:
SMW, Bio-mass
Power:
85 Mw heat; 1 x 34 tons per hour; 9,000 KJ/kg
Grid system:
Shove grid
Commissioning year:
2013
Scope of delivery:
Design, supplement, installation, commissioning of the grid and the boiler and auxiliary equipment 
Features:
Co-Incineration with Biomass (up to 50%), first waste incineration plant in Lithuania